Your browser does not currently support JavaScript.

If your are using Netscape 2 or later then you can enable JavaScript.

Version 2 or 3: Choose Options|Network Preferences, choose the Languages tab, click Enable Javascript and then click OK.

Version 4: Choose Edit|Preferences|Advanced, click Enable JavaScript and then click OK.


With Internet Explorer 5: Go to Tools Menu|Internet Options, Security Tab and click on the Custom Level. Then select disable active scripting under the scripting section.
 
  
HomeWhat's New
Products
SupportCompanyLocatorMilitaryContact
 
 
 
Flowbenches Dynamometers
Torque Conv. Rebuild
Drive Shaft Rebuild Data Acq. & Control Transmission Test
 
Introduction
Hubmaster
Hub Runout Inspector
Hydraulic Riveter
Piston Bonder
Platen Searer
Supertanker Air Test Stand
Balancer
Weld Aligner
Combo Lathe
Conveyor Parts Washer
Precision Engine Lathe
End Play Gauge



Are you paying $85 to $100 each for rebuilt torque converters? With no way of testing prior to Installation? And wasting time and money on costly come-backs? Click here to learn more>>


Final alignment welding



Final machining before assembly


Bond Front Cover and Piston


Final runout inspection


Piston, stator, and final assembly balancing


Production Hub Alignment and Welding


Rebuild Lockup Clutch


Remove clutch material fibers with searing process


Check internal clearances before installation








Rugged cut open lathe.


Fast, economical solution for high volume parts cleaning and degreasing.


Pressure test final assembly

 

Ask a Question    Make a Suggestion   Request Printed Literature   Need Financing?
 
     
Engine Dynamometer - Chassis Dynamometer  - Transmission Dynamometer - Towing Dynamometer - Torque Converter Dynamometer
Flowbench - Torque Converter Rebuilding Systems - Drive Shaft Rebuilding Equipment  - Data Acquisition and Control  - Tester
COPYRIGHT © 2006 SuperFlow
Site designed and developed by 30dps